Public Works Pre-Approved Plans & Policies - Prior to January 28, 2022

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

These plans are versions from before January 28, 2022

Looking for the most recent Pre-Approved Plans and Policies please click here.  

General:

Policy G-1 Easement Width Policy and Easement Recording Documents
Policy G-2 Utility Policy
Policy G-3 Pre Construction Form (fillable)
Policy G-4 Adequate Legal Description
Policy G-5 Non-Slip Covers for all Utilities in Pedestrian Areas
Policy G-6 Engineering Plan Requirements

Drainage:

Drainage Plans Full Package 2021
Policy D-1 Storm Drainage Line Easement
D-100 Frame Cover
D-200 Storm Lateral
D-210 Storm Cleanout
D-300 Through Curb Inlet
D-310 Sidewalk Drain
D-400 Carrier Pipe

ROW:

Policy R-1 Sidewalk Facility Maintenance Policy
Policy R-2 Street Asphalt Overlay Policy
Policy R-3 Placing Concrete or Asphalt in Adverse Weather
Policy R-4 Use of Temporary Soil Nails
Policy R-5 Replacement of Existing Curb and Sidewalk
Policy R-6 Driveway Policy (coming soon)
Policy R-7 Public Right of Way Street Tree Selection Policy
Policy R-8 Right of Way Easement
Policy R-9 Downtown Banner Program
Policy R-10 Traffic Impact Analysis (TIA) Guidelines
Policy R-11 For On-Street Public Parking Changes and Petition for Change to Public Parking Form
Right of Way Plans Full Package 2021
R-100 Sidewalk and Curb
R-101 Sidewalk and Curb
R-110 Gutter Pan
R-130 Flat Curb and Valley Gutter
R-140 Mountable Curb
R-150 Alley
R-160 Thickened Edge
R-170 Curb Radius Standard
R-200 Stop Sign and Road Name
R-201 Private Road Sign
R-210 Sign Placement
R-220 Post Location for Signs
R-250 Tree Planting Tree Well
R-251 Tree Planting Back of Walk
R-300 Compaction
R-305 Trench Restoration
R-310 Asphalt Overlay
R-320 Full Width Cold Patch
R-330 Utility Adjust
R-410 Rockery Detail Support Bank
R-411 Rockery Detail Sidewalk Support
R-420 Ecology Block Wall
R-450 Conditions for Safety Rail
R-451 Safety Rail
R-452 Chain Link Fence
R-500 Pavement Markings Arrow
R-501 Two Way Left Turn Arrow
R-550 Bike Lane Markings
R-551 Typical Bike Lane
R-552 Buffered Bike Lane
R-553 Bike Lane at Intersection
R-700 Monument Locations
R-710 Monument Case
R-800 Luminaire
R-810 Street Light Conduit Crossing
R-815 Street Light Conduit Location
R-820 Service Control Panel
R-900 Cement Concrete Steps

Sewer:

Policy S-1 Sanitary Sewer Line Easement
Sewer Plans Full Package 2021
S-100 Sewer Lateral
S-110 Side Sewer Installation
S-120 Double Sewer Cleanout
S-150 Frame Cover
S-160 Main Cleanout
S-200 Trench Detail
S-210 Water Sewer Spacing and Clearance
S-250 Carrier Pipes
S-300 Gravity Grease Interceptor
S-310 Hydromechanical Grease Interceptor
S-320 Electromagnetic Sewer Meter
S-321 Electromagnetic Sewer Meter Details
S-330 Parshall Flume
S-340 Control Pedestal
S-400 Sewer Manhole Channel Shelf

Water: 

Policy W-1 Water Line Easement
Water Plans Full Package 2021
W-100 Fire Hydrant
W-110 Filling Water Mains
W-120 Water Sewer Spacing and Clearance
W-150 Carrier Pipes
W-200 Double Check Detector Assembly
W-201 Standalone Fire Department Connection
W-210 Double Check Valve Assembly
W-230 Hot Box Enclosure
W-250 Water Meter Chamber
W-251 1.5 – 2 inch Water Meter
W-252 Double Meter Service
W-300 Vertical Thrust Blocking
W-310 Concrete Slope Anchor
W-400 Combo Air Valve