Wenatchee, WA
Home MenuPublic Works Pre-Approved Plans, Policies, Forms and Applications
Last updated March 7, 2024
General:
Policy G-1 Easement Width Policy and Easement Recording Documents
Policy G-2 Utility Policy
Policy G-3 Pre Construction Form (fillable)
Policy G-4 Adequate Legal Description
Policy G-5 Non-Slip Covers for all Utilities in Pedestrian Areas
Policy G-6 Engineering Plan Requirements
Policy G-7 Improvement Evaluation Packet
Policy G-8 Development Financial Securities Policy
Policy G-9 Utility Reimbursement Agreement
*General Forms, Applications & Reports
Telecommunications Master Permit Application
Call Before You Dig
Public Works Water and Sewer Connection Fees
Drainage:
Drainage Plans Full Package 2023
Policy D-1- currently does not exist
Policy D-2 Stormwater Policies
D-100 Frame Ring and Cover Details
D-200 Storm Lateral to Main Connections
D-210 Storm Cleanout for Driveway Areas
D-300 Through Curb Inlet
D-310 Sidewalk Drain
D-350 Gutter Pan at Through Curb Inlet
D-400 Carrier Pipe
D-500 Check Dam and Interceptor Trench
*Drainage Forms, Applications & Reports
Utility Services Request Form (Water, Sewer, Stormwater)
Eastern Washington Phase II Municipal Stormwater Permit
Stormwater Management Manual for Eastern Washington
Right of Way (ROW):
Policy R-1 Sidewalk Facility Maintenance Policy
Policy R-2 Hot Mix Asphalt (HMA) Pavement Cut Policy
Policy R-3 Placing Concrete or Asphalt in Adverse Weather
Policy R-4 Use of Temporary Soil Nails
Policy R-5 Replacement of Existing Curb and Sidewalk
Policy R-7 Public Right of Way Street Tree Selection Policy
Policy R-8 - Currently does not exist
Policy R-9 Downtown Banner Program
Policy R-10 Traffic Impact Analysis (TIA) Guidelines
Policy R-11 For On-Street Public Parking Changes and Petition for Change to Public Parking Form
Policy R-12 Street Vacation Application Requirements
Policy R-13 Outdoor Seating Temporary Use Permit
Policy R-14 Right of Way Hold Harmless Agreement
Policy R-15 Access to State Highways
Right of Way Plans Full Package 2023
R-100A Sidewalk
R-100B Curb and Gutter
R-110 Gutter Pan Through Curb Inlet
R-120 Directional Curb Ramps
R-130 Flat Curb and Valley Pan
R-140 Mountable Median Curb
R-150 Alley Cross-Section
R-160 Thickened Edge (Private Road)
R-170 Curb Ramp Locations
R-200 Stop Sign and Road Name
R-210 Sign Placement Near Sidewalks
R-250 Tree Well
R-300 Structure Compaction Requirements
R-305 Trench Repair and Compaction
R-310 Asphalt Overlay for Trench Repair
R-320 Full Width Cold Planning Detail
R-330 Utility Adjust
R-350 Utility Locations for New Roads
R-400 Rockery Wall
R-410 Rockery Detail Sidewalk Support
R-420 Ecology Block Wall
R-450A Conditions for Required Safety Railings
R-450B Safety Railing in Sidewalk
R-450C Chain Link Sidewalk Safety Railings
R-500A Pavement Markings Arrow
R-500B Two Way Left Turn and Typical Arrow
R-510 Pavement Marking Layout
R-550A Bike Lane Markings
R-550B Typical Bike Lane
R-550C Typical Buffered Bike Lane
R-550D Bike Lane at Intersection
R-600 Sight Distance Setback
R-700 Monument Placement
R-710 Monument Case
R-800 Luminaire Base, Light and Pole
R-810 Street Light Conduit Crossing
R-815 Conduit Location Street Lighting
R-820 Service & Control Panel Street Lighting
R-830 Service Cabinet for Street Lighting
R-900 Cement Concrete Steps
R-950 Bicycle Parking Rack
*Right of Way Forms, Applications & Reports
Right of Way Permit (work in public rights-of-way or easements)
Sewer:
Policy S-1- Currently does not exist
Sewer Plans Full Package 2023
S-100 Sanitary Side Sewer 12 Inch and Smaller Mains
S-110 Residential Side Sewer Installation
S-120 Sanitary Sewer Double Cleanout
S-150 Circle Frame Ring and Cover
S-160 Sanitary Sewer Main Cleanout
S-200 Sanitary Sewer Trench
S-210 Water and Sewer Spacing and Clearance
S-250 Carrier Pipe
S-300 Gravity Grease Interceptor
S-310 Hydromechanical Grease Interceptor
S-320A Electromagnetic Sewer Flow Meter
S-320B Electromagnetic Sewage Flow
S-330 Parshall Flume
S-340 Control Control Pedestal
S-400 Sewer Manhole Main Channel & Shelf
S-500 Single Family Lift Station
*Sewer Forms, Applications & Reports
Utility Services Request Form (Water, Sewer, Stormwater)
Water:
Water Plans Full Package 2023
W-100 Fire Hydrant Specifications
W-110 Filling New Water Mains
W-120 Water and Sewer Spacing and Clearance
W-150 Carrier Pipe
W-200A Fire Service Double Check Detector Assembly
W-200B Fire Service Standalone Fire Department Connection
W-210 Double Check Valve Premises Isolation
W-230 Hot Box Enclosure Back Flow Assembly
W-250A Water Box Chamber Water Meter Services
W-250B Single Meter Service
W-250C Double Meter Service
W-250D 3, 4 and 6 Inch Water Meter Chamber
W-310 Concrete Slope Anchor
W-400 Combo Air Valve
How to Winterize a Backflow Assembly
Installing a Double Check Valve Assembly (DCVA)
Installing a Reduced Backflow Assembly (RPBA)
*Water Forms, Applications & Reports
Cross Connection Blank Test Report Form
Hydrant Valve Application
Irrigation Check List
Maintenance Log for Grease Traps & Interceptors
Utility Services Request Form (Water, Sewer, Stormwater)
2022 Water Quality Report
Water Use Efficiency - 2021 Annual Performance Report
Backflow Assembly Testers List