Wenatchee, WA
Home MenuPublic works by the numbers
Interesting infrastructure information
The City of Wenatchee's Public Works Manages and Maintains:
- 118.77 center line miles of paved road
- 9.53 miles of dedicated bike lane
- 156.42 miles of sidewalk
-
1659 curb ramps
- 394 traffic signal heads
- 1782 street lights
- 48 signalized intersections
-
741,155 linear feet of sewer pipe
-
3,011 sanitary sewer manholes
-
609,512 linear feet of storm pipe
-
3,227 storm catch basins
-
1,494 storm water manholes
- 643,065 linear feet of water main
- 955 fire hydrants
- 9,203 water meters