List of projects completed in 2021
SOUTH MILLER ST. AND MONTANA ST. PEDESTRIAN CROSSING
This project installed curb extensions on the east side of South Miller Street at Montana Street to reduce the crossing distance, push-button activated flashing Beacons as well as upgraded lighting. Elements of construction included new asphalt pavement, a new luminaire, new ADA curb ramps, sidewalks and flashing beacons with associated electrical work.
TACOMA STREET IMPROVEMENT PROJECT: MAPLE TO MCKITTRICK
The project tied into recent improvements at McKittrick Street and Maple Street. This included curb and gutter on both sides of the roadway, a sidewalk along both sides of Tacoma Street, ADA ramps, roadway paving, and bike lanes in both directions.
The project also included a replacement of the water main, stormwater collection and conveyance upgrades, lighting improvements, and other utility improvements.